Fletcher Insulation

Chiller Replacement & Plant Reliability Upgrade

Project Overview

Located in Dandenong South, Victoria, Fletcher Insulation is one of Australia’s leading manufacturers of insulation products, supplying residential, commercial and industrial projects across the country.

To support the ongoing operation of this critical manufacturing facility, Premiair was engaged to deliver an urgent cooling solution that restored system capacity, reduced operational risk and maintained business continuity while a long-term plant replacement strategy was implemented.

Project Challenge

Fletcher Insulation’s chilled water plant consisted of two chillers, with one unit having reached the end of its operational life and no longer functioning. This left the facility relying entirely on a single remaining chiller, creating a critical lack of redundancy.

During routine servicing and fault investigation, Premiair identified that the remaining operational chiller had suffered a heat exchanger failure. Replacement of the heat exchanger was required; however, the lead time for the replacement component was approximately 20 weeks.

With no viable short-term repair option available and the facility requiring uninterrupted operation, an alternative solution was needed to restore cooling capacity and minimise operational risk.

Our Solution

Premiair proposed the replacement of the non-operational end-of-life chiller with a new Mitsubishi Electric chiller, providing an immediate solution to restore chilled water capacity to the site.

The new chiller was supplied, installed, commissioned, and integrated into the existing chilled water system, allowing the facility to continue operating while the replacement heat exchanger for the second chiller was sourced.

Once the heat exchanger became available, Premiair returned to site and completed the repair of the second chiller, restoring the plant to full operational capacity with complete redundancy.

Scope of Work

  • Chiller fault diagnosis and condition assessment
  • Identification of heat exchanger failure
  • Lifecycle assessment of existing plant equipment
  • Supply and installation of new Mitsubishi Electric chiller
  • Mechanical pipework modifications and connections
  • Electrical and controls integration
  • Chilled water system commissioning
  • Coordination of replacement heat exchanger procurement
  • Repair and recommissioning of existing chiller
  • Testing, balancing, and performance verification
  • Project management and turnkey delivery
Fletcher Insulation - Header
CLIENT
Fletcher Insulation
LOCATION
Dandenong South, Victoria
SECTOR
Manufacturing/Industrial
SERVICES PROVIDED
Chiller Replacement & Plant Reliability Upgrade

Project Outcome

The completed project restored critical cooling capacity and significantly reduced operational risk, providing Fletcher Insulation with a reliable and resilient solution to support ongoing manufacturing operations.
  • Restored cooling capacity to the facility without waiting for a 20-week component lead time
  • Eliminated reliance on a single ageing chiller
  • Installed a new high-performance Mitsubishi Electric chiller
  • Successfully repaired and recommissioned the second chiller
  • Restored the chilled water plant to 100% operational capacity
  • Achieved full system redundancy, significantly reducing operational risk
  • Improved long-term reliability and resilience of the site’s HVAC infrastructure

Other Projects

Join Our Team

Looking for a reliable partner to deliver and maintain high-performing building systems? Contact Premiair Group to get started.
premiair logo footer
Commercial air conditioning and mechanical services, delivered nationally from Melbourne for over 25 years.
ISO logos
CONTACT
© 2026 Premiair Group. All rights reserved.