Williamstown Town Hall

Boiler Plant Upgrade

Project Overview

Williamstown Town Hall is one of Melbourne’s most recognisable heritage civic buildings, serving as a valued community and events venue within Hobsons Bay.

Premiair Group was engaged to upgrade the ageing boiler plant, delivering a modern, reliable heating solution that improved system performance while respecting the operational and heritage requirements of the historic facility.

Project Challenge

The existing boiler plant at Williamstown Town Hall had reached the end of its operational life, resulting in reduced efficiency, increasing maintenance requirements, and reliability concerns for the facility’s heating system.

The client required a modern, energy-efficient solution that would improve performance, reduce operating costs, and integrate seamlessly with the building’s existing control systems.

Our Solution

Premiair delivered a complete boiler plant upgrade, replacing the ageing heating equipment with new high-efficiency condensing water heaters. The new system was integrated with the Building Management System (BMS), providing enhanced control, monitoring, and operational efficiency.

The upgrade ensured reliable heating performance while significantly improving the energy efficiency of the facility.

Scope of Work

  • Assessment of existing boiler plant and heating requirements
  • Removal and disposal of end-of-life boilers
  • Supply and installation of high-efficiency condensing water heaters
  • Modification of associated mechanical pipework
  • BMS controls integration and programming
  • Electrical and control system upgrades
  • System testing, commissioning, and performance verification
  • Provision of operating manuals and as-built documentation
  • Project management and turnkey delivery
Williamstown Town Hall (header)
CLIENT
Williamstown Town Hall
LOCATION
Melbourne
SECTOR
Government
SERVICES PROVIDED
Boiler Plant Upgrade

Project Outcome

By replacing ageing heating infrastructure with a modern boiler plant solution, Premiair helped future-proof the facility, improving operational reliability, energy efficiency and occupant comfort while supporting the long-term preservation of this important heritage building.
  • Replaced ageing, inefficient heating equipment
  • Improved energy efficiency and reduced operating costs
  • Enhanced system reliability and performance
  • Full integration with the Building Management System
  • Improved monitoring and control capabilities
  • Future-proofed heating solution for a significant community facility

Other Projects

Join Our Team

Looking for a reliable partner to deliver and maintain high-performing building systems? Contact Premiair Group to get started.
premiair logo footer
Commercial air conditioning and mechanical services, delivered nationally from Melbourne for over 25 years.
ISO logos
CONTACT
© 2026 Premiair Group. All rights reserved.